Most construction overruns are visible months before they become problems — if someone is measuring. Owner-side project management consultancy (PMC) places an independent professional between the owner and the contractors, whose job is to protect the owner’s interests on cost, time and quality.
Cost control
- A cost plan and BOQ prepared before tendering.
- Bills certified against measured work, not estimates.
- Variations reviewed, priced and approved before they are executed.
Schedule control
A baseline programme with clear milestones allows slippage to be spotted early. Regular progress reports compare planned and actual work, and recommend corrective action while it is still affordable.
Quality control
Inspection and test plans define what is checked, by whom and when — reinforcement before concrete, material test results, waterproofing and finishes. Problems found at these hold points cost a fraction of problems found after handover.
Documentation
Every decision, instruction and approval is recorded. This protects the owner in disputes and makes handover, maintenance and future resale far easier.
Is it worth the fee?
For most projects, the savings from tighter tendering, avoided rework and controlled variations exceed the PMC fee — and the owner gains time and peace of mind. Learn more about our construction management approach.